標(biāo)題 |
斷層條件下的隧道預(yù)支護(hù)設(shè)計(jì)與施工(51 卷) |
英文標(biāo)題 |
Design and construction of advance consolidation of tunnel in fault zone |
摘要 |
齊岳山隧道穿越F11斷層。此斷層規(guī)模宏大,斷層帶導(dǎo)水,核心帶巖體破碎,富含高壓水,其主要工程地質(zhì)問題是巖溶富水、突水突泥,高壓裂隙水等,施工難度極大。其中,進(jìn)口處為反坡施工,施工難度和安全風(fēng)險(xiǎn)尤為突出。為確保順利通過,采取隧道超前預(yù)支護(hù)綜合措施,即通過實(shí)踐更 |
作者 |
新聞作者:謝達(dá)文,彭峰,單紅雨 |