地鐵施工中既有橋梁的樁基托換技術(shù)(51 卷) |
英文標(biāo)題 |
Study on underpinning of pile foundation of existing bridge during metro tunnel driving |
摘要 |
西安地鐵二號(hào)線好又多人行天橋樁基托換工程中,采用鉆孔灌注樁+托換梁的手段對(duì)橋梁樁基進(jìn)行托換。本文介紹了主動(dòng)托換技術(shù)的設(shè)計(jì)﹑施工工藝及監(jiān)測(cè),闡述了樁基托換技術(shù)的控制要點(diǎn)和應(yīng)急處理措施,為此類施工提供參考。 |