連續(xù)梁鋼管拱異位拼裝整體頂推分析與施工(51 卷) |
英文標(biāo)題 |
Analysis and construction of assembling at non-bridge-place and positioning by integral jacking for continuous girder steel tubular arch |
摘要 |
鋼管拱異位拼裝整體頂推施工,實(shí)現(xiàn)了梁與拱的同步施工,保證大跨度梁體下既有公路或鐵路的安全,同時(shí)可有效縮短工期。 |