客運(yùn)專線多跨連續(xù)梁合龍段施工技術(shù)(51 卷) |
英文標(biāo)題 |
Construction technology of closure section of multi-span continuous girder on passenger- dedicated railway |
摘要 |
連續(xù)梁合龍段施工是懸澆施工中技術(shù)難度最大的一部分,而體系轉(zhuǎn)換是合龍段施工的關(guān)鍵。本文根據(jù)京石客運(yùn)專線石太直通線跨石銅路連續(xù)梁施工的工程實(shí)踐,介紹了連續(xù)梁合龍段施工順序、影響因素、需解決的問題和施工方法,可為以后同類連續(xù)梁的合龍施工提供參考。 |